亚洲欧美日韩精品专区

Looking for partners to create wealth together 400-9155-118
Product Center Products
Current location: Home Page Product Center
Building instant glue powder
Building instant glue powder
Model:
Browse: Recently One thousand five hundred and forty-two Person view
product details

        Product introduction
This product is a high elasticity, polymer waterproof coating made of polyurethane elastomers polymerized by high and new technology and made of various auxiliaries. It has good adhesion and watertightness, excellent UV resistance, high and low temperature resistance and durability. It has been effective for twenty years.
        Scope of use
This product is applied to all kinds of complex roofing, tile, gutter, toilet bath, basement, pool, warehouse, internal and external walls, tunnels and other works of waterproofing and moisture proofing. The construction is simple, and the irregular base surface does not affect the quality of the project.
        Instructions
The special rubber powder for lindstone polypropylene coiled material is refined from natural polymer materials. The product is non-toxic, tasteless, and non irritating, and can be quickly dissolved in cold water, forming a transparent viscous solution (which can replace 107 and 108 glue). It is ready to be used at any time on the construction site.
        Construction method
1, pour in cold water about 50KG in the barrel, start the stirrer, stir it quickly and pour it into a powder bag (500g), stirring for 1-2 minutes to make glue.
2, the glue can be made of 2-3 packets of cement, which can react quickly with cement and increase viscosity. It can be attached to 100 square meters of polypropylene cord.
        Matters needing attention
Use rubber to scrape or brush evenly, but should not be too thick when painted. It can be applied in a small amount. Otherwise, it will be difficult to dry at once. The drying time of the coating is about 4-6 hours at room temperature, and the dry time is determined according to the temperature and the location of the brushing position. Second times of coating can be carried out under the construction conditions. The construction environment is kept ventilated, and the construction personnel need to wear the necessary labor supplies. The surface of the base must be dry, clean and dust-free.

Other products
400-9155-118